The New Home for the Sheet Metal Industry Forums
SheetMetalTalk
 


Go Back   Sheetmetal Talk > Sheet Metal Forums > Sheet Metal Talk

Sheet Metal Talk
General discussion for fabrication and layout work. No advertising on forums, it will be deleted.
       


Share This Forum!  
 
 
     

 

Reply
 
Thread Tools Display Modes
  #1  
Old 12-15-2017, 11:29 PM
trackhound trackhound is offline
Junior Member
 
Join Date: Mar 2013
Posts: 2
Thanks: 0
Thanked 0 Times in 0 Posts
Default What will be faster making these louvered panels, stamp or Pullmax?

See the picture below.
Newbie here.....
I want to make 16 of these out of .085" approx. sheet steel. 38"x12", each panel has 20--7" louvers and 4--5.5"
I can spend the money on the 7" and 5.5" die and have them stamped in a 75 ton press in one shop or have a single die made for the Pullmax in another shop.
I have a small shop machinist friend that can custom make either die sets for me at half the going rate, so I know I'm ahead that way.
So which method, when each machine is set up, will be quicker?
I've never seen either of these machines at work except on Youtube and it looks like the Pullmax is slower.
I've got to farm the louver work out to separate shops, stamp or Pullmax, that will be billing me on setup time and for the louver forming process.
It's the labor that will cost me most
Which way would you guys go?
Attached Thumbnails
SAM_3000.jpg  
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


 

All times are GMT -6. The time now is 09:14 PM.


Powered by vBulletin®
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.